Substation Switch House and Yard, Seismic Evaluations

Tennessee and Alabama

Developed conceptual seismic strengthening for switch house buildings in the TVA system. All strengthening measures are considerate of the highly sensitive building functions and must allow for construction activities to occur during continuous, 24-hour operations of the switch house. These buildings were evaluated for Immediate Occupancy Performance following a major seismic event.