Lebanon Water Treatment Plant Process/ Administration Building

Lebanon, Oregon

The Lebanon WTP project includes a new water treatment plant (WTP) process and administration building. The building consists of a new 17,200 sq. ft. above-grade structure housing raw and potable water pumps, pipe gallery, membrane filters, chemical storage, chemical feed systems, and administration offices. The building is a single-story structure constructed of concrete masonry unit (CMU) walls. The roof system includes long span steel trusses and metal roof decking while the lateral-force-resisting system consists of concrete and CMU shear walls based on the Oregon Structural Specialty Code.

Looking for innovative, outside-the-box thinking? WRK Delivers.

Creative solutions are our business. WRK Delivers.

Service. Excellence. Creativity. WRK Delivers.

Proactive. Responsive. Reliable. WRK Delivers.

Design Excellence. WRK Delivers.

You need the right solution. WRK Delivers.

215 W. 12th Street, Suite 202, Vancouver, Washington 98660
360.695.9731

© 2016 WRK Engineers. All Rights Reserved. Sitemap. Privacy Policy.